Wall Segments Assembled

Ah! I finished assembling the Worthy project’s 14 wall segments with time enough for painting most of the 240 ft2 of the portions that are black. Tomorrow I’ll attach the the segments, finish painting the black parts, and start painting the 300 ft2 of the remaining portions, which will be white.

Here are six of the wall segments, stacked for quick painting.

six-wall-segments

The stack got a bit high, and so here are the remaining eight wall segments, placed on concrete blocks in the driveway.

eight-wall-segments